4.3 Design and build guidance
Guidance for outrigger loadings
4.3.10
The following are selected guidance for assessing and managing outrigger loadings for lifting
equipment.
TWF2022:002 Assessment and management
of outrigger loading available to download
from the TWf Library.
IPAF Spread Pad Calculator available at
https://pads.ipaf.org.
Industry guidance
4.3.11
100
Many organisations provide specialist guidance and advice applicable to the design and build of
temporary works in the construction industry. Some are shown below providing both free to
download and purchasable publications.