4.4 Design checking
4.4.5
BS 5975-1:2024 clause 12.7.4 states that where designs have been prepared by different
individuals or organisations, the design check categories should be appropriate to that design.
The following completed PC’s TWC master temporary works register example shows a range of
structures, and their assigned categories. This is for illustration purposes only.
4.4.6
The following completed PC’s TWC master temporary works register example shows items #004,
#005, and #006 as a range of independently designed structures forming the overall scaffolding
package. All have a design and build interface and all rely, and have impact, upon one another.
This is for illustration purposes only.