How to manage temporary works in construction - Book - Page 93
4.2 Designers Responsibilities
Temporary works design
4.2.8
The following organogram shows the relationship between key roles when designing of
temporary works. This is for illustration purposes only.
PC's Temporary Works
Coordinator (PC TWC)
Go to clause 10.2.3 and
10.2.4
BS 5975-1:2024 clause 7.4.2.1
states that a LTWD would be
required
where
there
are
substantial, or complex design
contributions from more than one
TWD, or where TWC requires
additional technical capability.
Lead Temporary Works
Designer (LTWD)
Principal Designer (PD)
Go to clause 7.4.2
Go to clause 7.4.2
BS 5975-1:2024 clause 7.4.2.1
states that a LTWD would be
required
where
there
are
substantial, or complex design
contributions from more than one
TWD, or where TWC requires
additional technical capability.
Temporary Works Design
Checker (TWDC)
Go to clause 12.7 and Topic
4.4
Temporary Works Designer
(TWD)
Go to clause 7.4.1
Supplier
BS 5975-1:2024 clause 8.1
provides a summary of the
combinations and multiple roles
that could exist for designers and
suppliers of temporary works.
The TWD could also supply the
equipment, and in some cases
could erect it.
Go to clause 9