Attempt to provide adequate support on sloping base marred by incorrectly cut wedge with the
load taken on the end-grain. The diagonal foot tie should have been lowered and a transverse lacing
added
Careful preparation of sloping surface, with over-site concrete and timber bearers, carrying accurately
located wedge pieces